HORIZONTAL CAVITY TRAY INTER-LOC 4-300L LONG LEAD 4 BRICK LONG

Product Code:

CAV04

Cavity trays are used when building extensions onto another building. For expample when building a garage joining on to a house. Cavity trays are supplied from stock with long lead and are also handed.
More Information
Product Type Simple product
Lead time
Pack Size Each
UOM ea